PF Formation sand wash plant and Pit 4, Maroota

Main switchboard for a CDE 400 tph sand wash plant, the Pit 4 switchroom and reticulation, then ongoing maintenance.

Aerial photo of the PF Formation sand wash plant at Pit 4, Maroota, in November 2023

Photo: Pit 4, November 2023

Builder or client
PF Formation (direct)
Location
Maroota NSW
When
2022 to 2024, maintenance since
Sector
Industrial

PF Formation runs a CDE sand wash plant rated at 400 tonnes an hour at its quarry at Maroota. A plant of that size depends on its main switchboard, and PF Formation engaged Vorick Group to build it in our own workshop: 16 modules with an ACB incomer, CT metering, MCCBs, drives and soft starters.

The Pit 4 upgrade followed, with a container switchroom, conduits across the pit, cable tray, motor and control cabling, a pump control board and the site communications.

We have maintained the plant since. The contractor that built the switchboard and cabled the pit is the one PF Formation calls for flood repairs, drive and motor replacements and PLC fault-finding, so faults are found by people who know the plant.

What we did

  • Main switchboard for the CDE 400 tph wash plant, built in our own shop: ACB incomer, CT metering, MCCBs, drives, soft starters, 16 modules
  • Pit 4 upgrade: container switchroom, conduits across the pit, tray, motor and control cabling, pump control board, site communications
  • Flood repairs, drive and motor replacements, PLC fault-finding, quarry maintenance

Services on this project

Industrial plant and equipment, Switchboards, Service and maintenance