Electrical projects
Retail precincts, medical centres, dealerships, seniors living, industrial estates, quarries and plant across Western Sydney, greater Sydney and NSW.

Cranebrook retail precinct, Penrith
Full electrical package for a new retail centre at Cranebrook, plus the El Jannah fit-out.
DSD Group
2 Ultimo Place, Marsden Park
Main switchboard, mains, power and data, NBN, dry fire, generator and five fit-outs for a large format retail precinct.
DSD Group
Unitas Business Park, Rouse Hill
Incoming supply and site switchboards through to the electrical fit-out of 17 business units.
SD Civil Engineering
BMW Penrith dealership
Electrical services and dry fire for a new BMW dealership, our second for Farindon Constructions.
Farindon Constructions
Bowral Commercial Development
Retail development for Kookai, Mecca, Oroton and Seed, with the main switchboard and boards from our own workshop.
Paynter Dixon
Blacktown Medical Specialist Centre
Base build for three levels and a 100-space basement, then the PRP Diagnostic Imaging fit-out with MRI, CT and PET CT rooms.
Stevens Construction (base build); PRP Diagnostic Imaging and tenants (fit-outs)
PF Formation sand wash plant and Pit 4, Maroota
Main switchboard for a CDE 400 tph sand wash plant, the Pit 4 switchroom and reticulation, then ongoing maintenance.
PF Formation (direct)Uniting Kamilaroi aged care, Lane Cove
Electrical infrastructure upgrade with two main switchboards and a 600 kVA standby generator while the home stayed live.
Rogers Construction Group, for Uniting
Greenside Stage 2, Soldiers Point
Every electrical, communications, security and dry fire service for a seven-storey, 62-unit seniors living building.
Stevens Construction, then SNL Building, for Soldiers Point Bowling Club
BlastOne blast rooms, booths and dust collectors
Electrical fit-out of blast rooms, spray booths and dust collectors across Australia: 46 installations in the two years to October 2026.
BlastOne International (direct)
Windsor RSL Club standby generator
A 400 kVA standby generator with interlocked switchgear, cabled to the club's mains board and six distribution boards.
Windsor RSL Club (direct)More of our work
| Project | Client | When | What we did |
|---|---|---|---|
| Bosch Rexroth facility, Marsden Park | Bosch Rexroth | 2026 to 2027, in progress | Electrical reticulation, six distribution boards from our own workshop, tray, main switchboard cabling, final circuits and bench power |
| Redbank, North Richmond, stages 1 and 2 | North Richmond Construction | 2023 to 2026 | Two site main switchboards, cafe and kiosks, then the IGA, carpark and strip shops |
| Dixon Firestone sandstone processing shed, Maroota | Dixon Firestone | 2024 to 2026 | New main switchboard and mains, machine connections, high-bay lighting, CCTV, then maintenance |
| Rutherford Business Park, 9 Mirage Road | Rogers Construction Group | 2024 to 2025 | New industrial units, each with three-phase power and 20 kW solar |
| McDonald's Stanmore, main switchboard upgrade | Streetbuild | 2024 to 2025 | New main distribution board and main switchboard upgrade, grading study, outage and changeover; network connection via our accredited partner |
Also: McDonald's Dapto and Albion Park Rail for ASA Group Projects; Dixon Sand; Arndell Anglican College; Jaycar Rydalmere for Structen; Chifley College Dunheved for Rogers Construction Group; Erina Leagues Club; Forefront; Popondetta Park for Baker Built; Bosch Rexroth Kings Park; and the maintenance accounts at Windsor RSL, Windsor Country Golf Club, Lelox, Hodgson Quarries, Richmond Inn Hotel and Automation Engineers.
Builders and developers we have delivered for
Logos do not imply an endorsement.Tendering a project?
Send the drawings and specification to estimating@vorickgroup.com, or call (02) 7233 1895.








