Dry fire, standby power and automation
Dry fire detection and EWIS cabling, standby generators to 600 kVA, automatic transfer, UPS and lighting control.
Dry fire detection and emergency warning cabling, standby generators and automatic transfer, UPS and lighting control: the systems that keep a building safe and running when the supply fails.
What we do
- Dry fire detection and EWIS (emergency warning system) cabling and programming, commissioned with the fire contractor
- Standby generators to 600 kVA, automatic transfer switches, interlocks and load bank testing
- UPS supply for medical imaging, communications and process equipment
- Lighting control (Dynalite), building control interfaces, pump and plant automation
Projects
All projects
Cranebrook retail precinct, Penrith
Full electrical package for a new retail centre at Cranebrook, plus the El Jannah fit-out.
DSD Group
2 Ultimo Place, Marsden Park
Main switchboard, mains, power and data, NBN, dry fire, generator and five fit-outs for a large format retail precinct.
DSD Group
BMW Penrith dealership
Electrical services and dry fire for a new BMW dealership, our second for Farindon Constructions.
Farindon Constructions
Bowral Commercial Development
Retail development for Kookai, Mecca, Oroton and Seed, with the main switchboard and boards from our own workshop.
Paynter Dixon
Blacktown Medical Specialist Centre
Base build for three levels and a 100-space basement, then the PRP Diagnostic Imaging fit-out with MRI, CT and PET CT rooms.
Stevens Construction (base build); PRP Diagnostic Imaging and tenants (fit-outs)Uniting Kamilaroi aged care, Lane Cove
Electrical infrastructure upgrade with two main switchboards and a 600 kVA standby generator while the home stayed live.
Rogers Construction Group, for Uniting
Greenside Stage 2, Soldiers Point
Every electrical, communications, security and dry fire service for a seven-storey, 62-unit seniors living building.
Stevens Construction, then SNL Building, for Soldiers Point Bowling Club
Windsor RSL Club standby generator
A 400 kVA standby generator with interlocked switchgear, cabled to the club's mains board and six distribution boards.
Windsor RSL Club (direct)Questions about standby generators and dry fire
What size standby generators do you install?
Standby generators to 600 kVA. Recent examples are the 400 kVA generator at Windsor RSL Club, connected through key-interlocked switchgear, and the 600 kVA generator at Uniting Kamilaroi aged care in Lane Cove.
Can you fit a standby generator to a building that is already running?
Yes. At Windsor RSL Club a 400 kVA generator was connected through interlocked switchgear to the club's mains board and six distribution boards, then commissioned and load tested. At Uniting Kamilaroi aged care a 600 kVA generator went in while the home stayed live.
Do you install automatic transfer switches and do load bank testing?
Yes. Automatic transfer switches, interlocks and load bank testing are part of our standby power work.
Is dry fire part of your electrical package?
Yes. Dry fire detection and EWIS cabling and programming are part of our electrical package where the project includes them, commissioned with the fire contractor.
Do you install UPS systems?
Yes. We install UPS supply for medical imaging, communications and process equipment.
Do you install lighting control?
Yes: Dynalite lighting control, building control interfaces and pump and plant automation.
Do you service generators after they are installed?
Yes. Generator servicing is part of our maintenance work.
More answers on our questions page.
Tendering a project?
Send the drawings and specification to estimating@vorickgroup.com, or call (02) 7233 1895.