Vorick Group, Confidence through quality
Aged care

Uniting Kamilaroi aged care, Lane Cove

Electrical infrastructure upgrade with two main switchboards and a 600 kVA standby generator while the home stayed live.

Builder or client
Rogers Construction Group, for Uniting
Location
Lane Cove NSW
When
August to November 2025
Sector
Aged care

Uniting upgraded the electrical infrastructure of its Kamilaroi aged care home in Lane Cove in 2025. Rogers Construction Group ran the project and engaged Vorick Group for the electrical work, from August to November.

An aged care home cannot be switched off while its switchboards are replaced, so the home stayed live on a temporary load centre throughout. Behind that we finalised the design, made the old installation safe and removed it, and installed new conduits, consumer mains and submains, two main switchboards and two main distribution boards, the light, power and air-conditioning boards, earthing and fire rating, with the network connection through our accredited partner.

A 600 kVA standby generator now backs the home's supply. Handover included testing, as-built drawings and training. Kamilaroi is one of three projects we have delivered for Rogers Construction Group, with Rutherford Business Park and Chifley College Dunheved.

What we did

  • Design finalisation, demolition and make-safe, conduits, consumer mains and submains; network connection via our accredited partner
  • Two main switchboards and two main distribution boards, light, power and air-conditioning boards, earthing and fire rating; 600 kVA standby generator
  • The home stayed live on a temporary load centre throughout; testing, as-builts and training at handover

Services on this project

Commercial and retail construction, Switchboards, Dry fire, standby power and automation

All projects

Tendering a project?

Send the drawings and specification to estimating@vorickgroup.com, or call (02) 7233 1895.